Every Aura project follows the same clear path. One team coordinates design, engineering, factory production and delivery, while site work moves forward at the same time.
3 to 12 months from planning to move-in
Depending on size, design path and local approvals
How it works
Five stages, one team
You choose how much design you want: start with an Aura model, adapt one to your site, or design something entirely your own. The steps that follow are the same for every path. The paid phases begin once you accept a planning proposal and the planning fee is received.
Choose your path
Three ways to begin
Planning fees are confirmed in your proposal and credited toward your contract when you move forward.
Step by step
Your project, step by step
Permitting, site preparation and factory fabrication often run at the same time, which shortens the overall schedule.
Your budget
How your project cost comes together
Payments and warranty
A clear payment schedule
Specific terms are set in your contract.
Our warranty
When a local builder is part of your team, Aura warrants its work to the builder, who provides the overall warranty for your home.
Before your call
Helpful to have on hand
- Address or map pin, and site photos
- Survey or site plan, if you have one
- HOA requirements, if any
- Soils and utility information
- An idea of your budget and timeline
No land yet? We can share feedback on sites you are considering or connect you with a realtor. Using financing? We can introduce lenders familiar with modular construction.
Founded by architects Rame & Russell Hruska, AIA · Intexure Architects since 2001 · 7 national design awards · Projects in 5 states
Questions
Process FAQ
Does the first call cost anything?
No. The initial call has no cost or commitment. Paid phases begin only once you accept a planning proposal.
Is the planning fee credited?
Yes. Planning fees are confirmed in your proposal and credited toward your contract when you move forward.
How long does the whole process take?
Most projects take 3 to 12 months from planning to move-in, depending on size, design path and local approvals.
Who handles permits?
We prepare the drawings and submit for state regulatory approval. In Texas we typically handle local permitting; out of state, the local builder does. Some locations do not require local permits.
Is the factory price fixed?
Yes. The factory price is firm, apart from any allowances identified in planning. Transportation and sitework are estimates confirmed for your site.
Do I need land before calling?
No. We can give feedback on sites you are considering, connect you with a realtor, and introduce lenders familiar with modular construction.
Start with a conversation.
Tell us where you would like to build and how you plan to use it. The first call is free, with no commitment.